Tubular Transmission Crossmember

JSM

Active member
Re: Tubular Transmission Crossmember

Going by the first post in this thread, did you get me on the list??

80e?


Yes sir,

Flanges all showed up by fedex today. Nice delivery guy, obviously noticed I was a bit beat up and brought the heavy package into the house.

Tubing is enroute.
 

GT42RSY

Large Turbo
Re: Tubular Transmission Crossmember

Is it to late to get one of these for an 80e? I didn't see the post until today and will be needing one. I figured it was worth asking.
 

DanenGraham

Big in the rear
Re: Tubular Transmission Crossmember

Yes sir,

Flanges all showed up by fedex today. Nice delivery guy, obviously noticed I was a bit beat up and brought the heavy package into the house.

Tubing is enroute.


Okay, thanks. Will send the money tomorrow.

Big thanks to JS, and anyone else that is helping on this project.
 

JSM

Active member
Re: Tubular Transmission Crossmember

Is it to late to get one of these for an 80e? I didn't see the post until today and will be needing one. I figured it was worth asking.

I can put you on the waiting list if someone backs out. I ordered enough material for a few extra but they have already been consumed. Being flanges are already cut and at my door doesn't make it easy to make just 1 more.
 

jharrison

New member
Re: Tubular Transmission Crossmember

Just curious, I didn't see myself on the list. I paid in full on 11/4, unless #3 was a typo and should be J.H instead of J.J.
 

JSM

Active member
Re: Tubular Transmission Crossmember

List on page 1 isn't complete, I have a private list I have kept up to date, don't worry.
 

GT42RSY

Large Turbo
Re: Tubular Transmission Crossmember

Please do put me on that waiting list. I will take one asap if someone backs out or doesn't need one anymore. Thank you
 

JSM

Active member
Re: Tubular Transmission Crossmember

Well, good news is we had a good day today. Had everything lined up, parts here and with some help all of the crossmembers are welded. 1/2 are powder coated with the other half to be coated by end of the weekend.

Those that have paid will start shipping, those that haven't paid yet will ship when payment is received.

Jeff
 

JSM

Active member
Re: Tubular Transmission Crossmember

Started shipping today, taking me a bit to get them boxed and can only carry so many at a time to UPS. Should have all those that paid shipped this week.

I do have the last batch in the powder coat oven, and as luck would have it the oven stopped getting to temp. So they are hanging with powder, just not heated yet. Gotta find out if a heating element burned out of what.

All 700's are done and coated, and several 80e's so shouldn't be problem for those paid.
 
Top